Waterloo Bridge central arch closed to navigation for safety checks
The central arch of Waterloo Bridge has been shut to boats for urgent safety checks "due to material falling from the expansion joints," the Port of London Authority has announced.
From the SE1 archive
This article was originally published in 2011. Information may have changed since publication.
This article was originally published in 2011. Information may have changed since publication.
A harbour service launch with a flashing blue light was stationed under the arch on Friday evening to alert boat crews to the closure.
On Saturday signs were installed to show that the arch is out of use.
The PLA says that "detailed examinations in order to determine necessary repairs are to take place in the week commencing 28 November".
Published by London SE1 — original article
https://www.se1.news/waterloo-bridge-central-arch-closed-to-navigation-for-safety-checks/